Vancouver Premium Home Design designs multiplexes and small-scale multi-unit housing (SSMUH) in Port Moody, from the first zoning check to the Development Permit and building permit drawings. Since Council adopted the City’s SSMUH zoning amendment in June 2024, eligible single detached lots in Port Moody can hold three to six homes without rezoning, but every project still needs a Form and Character Development Permit before a building permit. This page explains what your lot can take and how the approval path works.

At a glance

  • Service: Design and permit drawings for duplexes, triplexes, fourplexes, sixplexes, houseplexes and homes with suites under Port Moody’s SSMUH zoning
  • Area served: Port Moody, including Moody Centre, Glenayre, College Park, Pleasantside, Heritage Mountain, Heritage Woods and Ioco
  • What’s included: Lot eligibility and unit count check, site planning around trees and slopes, unit layouts, Development Permit package, consultant coordination, building permit drawings and reviewer responses
  • Steps: Feasibility, pre-application with City staff, Development Permit, engineering and servicing, building permit, builder hand-off
  • How to start: Call 604-929-6696 or request a free design quote

How many units can you build on a Port Moody lot?

Three, four or six, depending on lot size and how close the lot is to frequent transit. The City’s A Guide to SSMUH sets it out:

  • Lots of 280 m² (about 3,015 sq. ft.) or less: up to 3 units.
  • Lots over 280 m² up to 4,050 m² (about one acre): up to 4 units.
  • The same lots within 400 m of a frequent bus stop: up to 6 units.

Eligible zones are RS1, RS1-S, RS2, RS3, RS5, RS6, RS7, RS8, RS9 and RT, on lots shown on the City’s SSMUH Areas Map. Lots larger than 4,050 m² and lots inside Transit Oriented Areas are not covered, and some heritage-protected lots are exempt. A building scheme registered on title can also stop an application until it is discharged, so we check title early.

Multi-level multiplex concept stepping down a hillside lot in Port Moody

Do you need a Development Permit for a multiplex in Port Moody?

Yes. SSMUH is a conditional use in Port Moody, so a Development Permit for Form and Character is required before the City will issue a building permit. City staff, not Council, authorize these permits, using the design guidelines in Chapter 16 of the Official Community Plan.

Two other development permit areas often apply as well: Environmentally Sensitive Areas (DPA 4) and Hazardous Conditions and Steep Slopes (DPA 5). On RS1-S lots inside the Moody Centre Heritage Character Area, the Intensive Residential Development Guidelines apply rather than the multi-family guidelines. The City’s SSMUH page lists the current guidelines.

What site rules shape a Port Moody multiplex design?

Trees, parking, side yards and stormwater usually decide the layout before the floor plans do. The City’s guide includes these working numbers:

  • Impermeable surfaces: no more than 75% of the lot, with stormwater managed on the lot.
  • Emergency access: a side yard of at least 1.5 m for an access path.
  • Parking: a front yard at least 5.6 m deep where parking sits in front; lane access is used where a lane exists. Parking minimums depend on unit count, bus stop distance and road type, and are removed for six-unit lots near frequent transit.
  • Privacy: main living spaces facing an interior side lot line need an enhanced 5.5 m setback.
  • Trees: the guide targets 35% canopy cover and sets building setbacks of 3 m from large trees and 2 m from medium trees.
  • Retaining and landscape walls: kept to 0.9 m or less.

The lot coverage rules are written to favour building up rather than out, and they allow three storeys. On the sloped lots common around Heritage Mountain and Pleasantside, that often means stacked units or a stepped building rather than a row along the street.

Want to know what your lot allows? Call 604-929-6696 with your address and we will tell you the likely unit count and the first constraints to check.

How does the Port Moody SSMUH approval process work?

Development Permit first, then building permit, with engineering running alongside. The City’s guide describes four stages, and our design work follows them:

  1. Early consultation. We test unit count and layout options, then meet Community Development staff. The City recommends a pre-application meeting but only comments formally on complete applications.
  2. Development Permit. A complete package with site plan, elevations, landscape and arborist input. Staff send comments and we revise and resubmit as needed.
  3. Engineering and servicing. Frontage works and servicing are coordinated with the City’s Engineering department, plus outside approvals such as BC Hydro where needed.
  4. Building permit. Submitted once the design is settled, with structural, geotechnical and energy advisor input. A servicing agreement is signed before the building permit is approved.

For complete applications on uncomplicated sites, the guide says to expect initial comments in about four to six weeks for a Development Permit and about eight weeks for a building permit. Sites with slopes, watercourses or many trees take longer.

Side-by-side duplex with separate entries, a common SSMUH layout for Port Moody lots

Who else is on a Port Moody multiplex team?

The City’s guide lists the consultants it expects, and we coordinate them so the drawings agree. Depending on the site, that includes a civil engineer, structural and geotechnical engineers, a certified energy advisor, an arborist, a landscape designer and a qualified environmental professional.

The guide also notes that an architect is required once a building passes certain size, storey or unit thresholds. We tell you at the feasibility stage whether your project crosses that line and bring an architect in when it does.

Which multiplex type fits your lot?

It depends on lot width, slope, lane access, trees and whether you plan to live on site, rent or sell. Common choices in Port Moody are:

  • Duplex with suites for families who want two homes plus rental income.
  • Front-back triplex or fourplex on lane-access lots in Moody Centre and Glenayre.
  • Stacked units on steep lots where a long footprint would need tall retaining walls.

Our SSMUH and multiplex design services page compares these types across Metro Vancouver. If you are weighing a single new house instead, see our older guide to designing a home in Port Moody.

Frequently asked questions

Do I need to rezone my Port Moody lot to build a multiplex?

No, not if the lot is in an eligible SSMUH zone and area. Port Moody’s 2024 zoning amendment allows three to six units on eligible lots without rezoning, but a Form and Character Development Permit is still required.

How do I know if my lot is within 400 m of a frequent bus stop?

The City publishes an SSMUH Areas Map showing eligible lots and the frequent transit buffer. We check your address against it on the first call.

Can I build six units on a large Port Moody lot far from transit?

Generally no. Lots over 280 square metres and up to 4,050 square metres can have up to four units unless they are within 400 m of a frequent bus stop, where up to six are allowed.

How long does Port Moody take to review a multiplex application?

For complete applications on simple sites, the City’s guide expects initial comments in about four to six weeks for a Development Permit and about eight weeks for a building permit. Total time depends on revisions, site complexity and servicing.

Will trees on my lot limit the number of units?

They can. The guide sets a 35% canopy target and building setbacks from large and medium trees, and tree removal needs a permit with replanting or cash-in-lieu. An arborist report early on shows how much room is left.

What does multiplex design cost in Port Moody?

It depends on the number of units, the site and which permits apply. Vancouver Premium Home Design gives a fixed design fee proposal after reviewing your lot.

Plan your Port Moody multiplex

Send us your address and what you hope to build. We will tell you how many units the lot is likely to allow and what to sort out before design starts.

We reply within one business day.

Port Moody’s zoning, development permit guidelines and fees are being updated. Confirm current requirements with the City of Port Moody for your specific property.